In the heart of Bellevue’s central business district, a transformative project is underway that promises to redefine the skyline and cater to the evolving needs of high-tech businesses and professionals. “The Artise,” a forthcoming 25-story office tower, is set to be a monumental addition, seamlessly blending innovation, sustainability, and architectural brilliance.
Location: Bellevue, Washington
Square Feet: 1,040,000
Stories: 25
Service: Structural
Industries: Commercial, High Rise / Performance Based Design
Primary Material: Steel
Contents
- 1 Architectural Marvel Unveiled: The Vision for The Artise
- 2 Navigating Challenges: Innovative Solutions for Maximum Impact
- 3 Project Highlights: A Glimpse into The Artise’s Distinct Features
- 4 The Visionary Minds: Scott D. Erickson’s Creative Endeavors
- 5 Looking Ahead: The Future of The Artise and Bellevue’s Skyline
Architectural Marvel Unveiled: The Vision for The Artise
As the architectural landscape continues to evolve, The Artise stands out as a testament to forward-thinking design. Spearheaded by DCI Engineers, renowned for their structural prowess, this 25-story tower is more than just a building; it’s a sophisticated integration of form and function.
The Structural Backbone:
The Artise boasts a state-of-the-art steel-framed structure, carefully crafted to appeal to high-tech businesses and professionals. DCI Engineers, serving as the structural engineer of record, has embraced innovation, incorporating buckling restrained mega braces and steel moment frames. This not only ensures structural integrity but also aligns with the project’s commitment to performance-based design for resiliency and economy.
Strategic Location:
Nestled in Bellevue’s central business district, The Artise is strategically positioned to meet the demands of the thriving real estate market. With a total area of 1,040,000 square feet and 25 stories, the tower is set to become a prominent feature in the city’s skyline, offering unparalleled views and accessibility.
Every architectural endeavor comes with its unique set of challenges, and The Artise is no exception. One such challenge was presented by an aquifer, limiting the depth of excavation. To overcome this hurdle, DCI Engineers devised a creative solution to maximize below-grade parking while ensuring the aquifer remained uncontaminated.
Below-Grade Parking Optimization:
Recognizing the paramount importance of available parking, especially for office occupants, DCI Engineers eliminated all lateral shear-resisting elements below grade. Traditional approaches involve concrete cores and braced frames extending to the foundation. However, The Artise took a different route, utilizing perimeter Buckling Restrained Braces (BRBs) to support lateral forces. The lateral braces conclude at Level 1, seamlessly transferring forces to the basement walls. This groundbreaking design decision resulted in an open, unobstructed basement level—maximizing parking space and minimizing excavation costs.
Transitioning to Category 3 Building:
In the dynamic world of real estate, flexibility is key. Late in the design process, the tenant signed on, prompting a shift from a Category 2 building to a Category 3 building, catering to more than 5,000 occupants. This transition required innovative solutions to maintain aesthetic consistency. Fluid viscous dampers, akin to substantial shock absorbers, were introduced in parallel with the buckling restrained mega braces. This not only reduced drift to acceptable limits but also marked the pioneering use of fluid viscous dampers in Bellevue.
Project Highlights: A Glimpse into The Artise’s Distinct Features
Ground Floor Extravaganza:
The ground floor of The Artise is destined to be a vibrant hub, featuring 7,522 square feet of retail space, a public plaza, and a dynamic great room. This meticulously planned space is not just about commerce; it’s a deliberate effort to activate the streetscape, creating a welcoming environment for visitors and occupants alike.
Architectural Finesse:
The lateral system design of The Artise is a testament to architectural finesse. The super brace system, where braces connect every 3 or 4 floors, allows for unique design patterns around the building. The western façade showcases a transitional pattern of braces, creating a distinguishable entrance that adds to the overall aesthetic appeal.
The Visionary Minds: Scott D. Erickson’s Creative Endeavors
Scott D. Erickson, Principal in Seattle and a licensed Professional and Structural Engineer (PE, SE), has played a pivotal role in bringing The Artise to life. His commitment to using creativity to develop architecturally pleasing yet cost-efficient building solutions shines through in this project.
Scott D. Erickson’s Perspective:
“I love being able to use my creativity to help the design team develop architecturally pleasing, cost-efficient building solutions.”
Looking Ahead: The Future of The Artise and Bellevue’s Skyline
As The Artise takes shape, it symbolizes more than just a physical structure. It represents the evolution of architectural practices, the successful navigation of challenges, and the seamless integration of aesthetics and functionality. With its prime location, innovative design elements, and commitment to sustainability, The Artise is poised to become a landmark in Bellevue’s central business district, attracting high-tech tenants and setting a new standard for urban campus development.
In conclusion, The Artise isn’t just a building; it’s a testament to the limitless possibilities when visionary design meets structural ingenuity. As Bellevue’s skyline welcomes this architectural marvel, it invites us all to contemplate the future of urban development—one where innovation and sustainability go hand in hand, shaping cities that stand the test of time.